Reclamation
Filling
The reclamation filling was
carried in the following series:
-
A layer
of sand was laid for seabed preparation;
-
placing
of geotextile;
-
installation
of vertical drains;
-
filling
material transported to the site and
-
compaction
of the filling materials
Reclamation
Filling