1. Sampling Fresh Concrete |
In sampling the fresh concrete from a ready-mixed vehicle, the first 0.3m3 and the last 0.3m3 concrete should be disregarded. The sample should be collected from three approximately equal increments taken after about 1/6, 1/2 and 5/6 of the discharge of the batch. | ![]() |
The sample collection procedures: | |||
![]() |
![]() |
![]() |
![]() |
Some Tools for concrete Test | Sampling from ready-mixed vehicle | Achieved the required quantity of fresh concrete | Mixing the sampled fresh concrete thoroughly |